Activity

Coal Preparation

With its vast experience of working on various types of Indian Coal, MBE can select the most appropriate washing circuit for both Coking and Non-Coking coal. Since 1979, when MBE has built India’s first indigenously designed 700 TPH Coal washery at Sudamdih to 2006 when we are building 1.5 MTPA Coal Washery at Sarshatali for CESC (prestigious RPG Group), the bottom line continues to be the same – combine economy, efficiency, flexibility, and in the process ensuring optimum yield with minimum capital and low operating cost.