With its vast experience of working on various types of Indian coal, MBE can select the most appropriate washing circuit for both Coking and Non-Coking coal. Since 1979, when MBE had built India’s first indigenously designed 700 TPH Coal washery at Sudamdih to 2008 when the 1.5 MTPA Coal Washery at Sarshatali for CESC (prestigious RPG Group) was commissioned, the bottom line continues to be the same – a combination of economy, efficiency and flexibility - ensuring optimum yield with minimum capital and low operating cost as a result.

MBE has state-of-the-art Coal washing technology for executing a complete Coal preparation / Washing plant of any capacity on EPC / Concept to Commissioning basis, along with Overseas Technology suppliers. MBE has gravity separation Technology with Jigging and Heavy media separation for both Coking & Non Coking Coal application. MBE also possesses fine upgradation through Flotation process and equipment.

Since inception, MBE has engineered, constructed and executed six numbers major washeries, which are still in operation. In 1979, MBE built India’s first indigenously designed 700 TPH coal washery at Sudamdih.

The Company has in-house facility for manufacturing the main equipment required for the Coal preparation plant and one of the largest fabrication workshops in the country. It can manufacture Crushers and other Communition equipment, Sizing Screens of all types for Dry and Wet application and Screens for Dewatering, De-sliming, De-pulping & Rinsing application. MBE also manufactures Equipment for recovery & recirculation of water in the Coal preparation plant through Thickeners. MBE can provide value added solutions & services for Coal Beneficiation plants under one roof.

Coal Washery (CESC),
Inside the plant of Sarsethali
Coal Washery (CESC),
Sarsethali